| Implementation items |
Implementation details |
| Improved consumption |
・Introduction of new energy-saving processing technology to newly-built lines |
| ・Development of reducing energy losses to a minimum with existing equipment |
| Improved supplies |
・Improved efficiency of energy supply equipment - Introduction of co-generation
|
|
When shipping steam is maximum |
When the output of power generation is maximum |
| Power generation output |
5,700kw |
6,500kw |
| Shipping steam amount |
10.4t/h |
4.8t/h |
|
|
| ・Change from petroleum to LNG (Liquid Natural Gas) fuels (2005) |
| Development |
・Mutual diagnoses for energy-saving |
| ・Inspection of the best plant for energy management |
| ・Participation for internal and external meetings to announce examples of energy-saving initiatives |